Valued Engineering Solutions

Taplanes pods are designed with a minimalist aesthetic. They feature clean lines; few, striking materials; and an architectural profile that is dramatic in its simplicity. In keeping with its minimalist principles, the Taplanes approach to design and manufacture is about prioritising the essential; the pod structure and interior design is stripped to its core function, realised using limited materials, neutral colours, simple forms, and avoiding excess ornamentation to achieve a pure form of elegance and assured functionality.
  • Standard, tailored and bespoke bathroom pod options with no MOQ.
  • Most of our bathroom pods are designed and manufactured based on your specific requirements.
  • Refurbishment & Redevelopment: We can design and manufacture a sectional pod through doorways, which is ideal for redevelopment and refurbishment projects. These sectional pods can be manoeuvred through doorways, offering the possibility of using off-site manufacturing where there is no access to crane in a bathroom pod
  • New Build: we can design and manufacture one-piece or sectional bathroom pods to complement a new building design

BDE will follow the UCDO approach to assure client has full transparency on budget & timescale.

Understand

Create

Deliver

On-going
Support

Understand

Create

Deliver

On-going Support

Clients can visualise each pod design with AutoCad drawings and gain full clarity on installation and maintenance prior to actual commitment on production.
General Information
  Traditional Build GPR Pod Taplanes Pod
Product Cost  £3,000 £2,800 £4,752
Mould Set Up Cost 0 £30,000  0
Minimum Order Quantity (Units) 1 200 1
Per unit cost (Including Overhead) £3,000  £2,950  £4,752 
Installation Cost
Man Days require for Installation 6 4 1
Average UK Man Day Cost  £280  £280  £280 
Crane Cost Per Day 0 £400  0
Total Installation Cost  £1,680  £1,520  £280 
Initial Investment (1st Installation) £4,680  £4,470  £5,032 
 
Shelf Life (Years) 10 8 30
Dismantling Cost (If the product fail or needs redesign)
Man Days require for Dismantling 6 6 1
Average UK Man Day Cost  £280  £280  £280 
Total Dismantling Cost £1,680  £1,680  £280 
Recyclability No  No  Yes
Waste Disposal Fee £100  £100  £                             –   
Total Dismantling Cost £1,780 £1,780 £280 
Assuming the bathroom facilities expected to be in function for 20 Years
10 Years Refurbishment (Assuming 20% increment in 10 years) Traditional Build GPR Pod Taplanes Pod
Dismantling Cost (If the product fail or needs redesign)
Man Days require for Dismentaling 6 6
Average UK Man Day Cost  £336  £336   
Total Dismantling Cost £2,016  £2,016   
Recyclability No  No   
Waste Disposal Fee £120 £120   
Total Dismantling Cost £2,136 £2,136   
Brand New Purchase
Product Cost (New Cost) £3,600  £3,540   
Mould Set Up Cost 0 £              –     
Minimum Order Quantity (Units) 1 1  
Per unit cost (Including Overhead) £3,600  £3,540   
New Installation Cost
Man Days require for Installation 6 4  
Average UK Man Day Cost  £336  £336   
Crane Cost Per Day 0 £        480   
Total Installation Cost  £2,016  £                      1,824   
20 Year Refurbishment – Assume 20% increment in 11th to 20th Years Traditional Build GPR Pod Taplanes Pod
Dismantling Cost (If the product fail or needs redesign)
Man Days require for Dismantling 6 6  
Average UK Man Day Cost  £403  £403   
Total Dismantling Cost £2,419  £2,419   
Recyclability No No  
Waste Disposal Fee £144  £144   
Total Dismantling Cost £2,563  £2,563   
Brand New Purchase
Product Cost  £4,320  £4,248   
Mould Set Up Cost 0 £           –     
Minimum Order Quantity (Units) 1 1  
Per unit cost (Including Overhead) £4,320  £4,248  
New Installation Cost
Man Days require for Installation 6 4  
Average UK Man Day Cost  £403  £403   
Crane Cost Per Day 0 £480   
Total Installation Cost  £2,419  £2,093   
Unit cost + Install cost (total cost) £6,739  £6,341   
Total Investment for having a fully function bathroom facilities      
  Traditional GRP Taplanes
Shelf Life 10 8 30
       
Initial Investment + Installation £4,680  £4,470  £5,032 
10 Years Refurbishment Cost £7,752  £7,500   
20 Years Refurbishment Cost £9,302  £8,904   
       
Total Investment on Bathroom Facilities (Over 20 Years) £21,734  £20,874  £5,032 
Cost per year for having a fully function bathroom facilities £1,087  £1,044  £252 
  332% 315%